Full legal name: OBSHESTVO S OGRANICHENNOJ OTVETSTVENNOSTYU SPETCIALIZIROVANNIJ ZASTROJSHIK "SEVERSTROJ"
Leader: Fidorenko YAroslav Igorevich
Date of entry in the register: 11.02.2013
The authorized capital: 10000 ths rub.
Number of staff: 4
Number of founders: 1
Legal address: RUSSIA, 392003, Tambovskaya area, G. TAMBOV, UL. MENDELEEVA, D. 1, KABINET 3
E-mail: everstory68@mail.ru
Site (www):
Telephone(s): +7(475)271-93-10, +7(953)701-18-05, +7(920)486-84-44, +7(910)856-86-85, +7(910)755-78-20, +7(910)758-39-83
TIN (INN): 6829088819
KPP (tax registration reason code): 682901001
OKPO (All-Russian Classifier of Enterprises and Organizations): 12386341
OGRN (Primary state registration number): 1136829000835
OKFS (National Classification of ownership): 16 - Private property
OKOGU (National Classification of state power and control): 4210014 - Organizations established by legal entities or citizens or legal entities and citizens together
OKOPF (National Classification of legal forms): 12300 - Limited liability companies
OKTMO (National Classification of municipalities): 68701000001
OKATO (National Classification of administrative and territorial division): 68401368 - Tambovskaya area, citya oblastnogo znacheniya Tambovskoj area, Tambov, Oktyabrskij
Main (NACE): 45.2 - Development, Construction, Building and construction
Additional:
45.21 | Civil works |
45.21.1 | Civil works for the construction of buildings |
45.23.2 | Construction of sports facilities |
45.21.2 | Civil works for the construction of bridges, elevated highways, tunnels and subways |
45.23 | Construction of roads, airfields and sports facilities |
45.23.1 | Civil works for the construction of roads, railways and runways runways |
45.21.3 | Civil works for laying of pipelines, communication lines and power lines |
45.21.4 | Civil works for laying and laying pipelines, communication and power lines, including related ancillary works |
45.21.5 | Civil works for the construction of power plants and installations for the mining and manufacturing industries |
45.21.51 | Civil works for the construction of hydroelectric power plants |
45.21.52 | Civil works for the construction of nuclear power plants |
45.21.53 | Civil works for the construction of thermal power plants and other |
45.24 | Construction of water projects |
45.21.54 | Civil works for the construction of facilities for the mining and manufacturing industries |
45.21.6 | Civil works for the construction of other buildings and structures, not nec |
45.1 | Preparation of construction site |
45.3 | Installation of building services and structures |
45.31 | Production Services |
45.33 | Manufacture of sanitary works |
45.34 | Installation of other engineering |
45.4 | Manufacture decorating |
45.41 | Plastering works |
45.42 | Manufacture of joinery and carpentry work |
45.43 | Device Floor and wall covering |
45.44 | Manufacture of Painting and glazing |
45.45 | Manufacture of decoration and finishing works |
45.22 | The unit covers buildings and structures |
45.25 | Manufacture of construction |
45.5 | Rental of construction machinery and equipment with operator |
45.50 | Rental of construction machinery and equipment with operator |
45.32 | Manufacture of insulation |
Find similar businesses (with the same NACE and OKATO)
Name | Share | Amount |
HVOROVA VERA IVANOVNA | 100% | 10000 ths rub. |
Financial statements (accounting figures): | |||
Code | Indicator | Value | Unit |
F1.1100 | Total for Section I - Non-current assets | 22220 | ths rub. |
F1.1200 | Total for Section II - Current assets | 970261 | ths rub. |
F1.1600 | BALANCE (asset) | 992481 | ths rub. |
F1.1300 | Total for Section III - Own capital | 120427 | ths rub. |
F1.1400 | Total for Section IV - Long-term liabilities | 246814 | ths rub. |
F1.1500 | Total for Section V - Short-term liabilities | 625240 | ths rub. |
F1.1700 | BALANCE (passive) | 992481 | ths rub. |
F2.2100 | Gross profit (loss) | 38744 | ths rub. |
F2.2200 | Profit (loss) from sales | 35328 | ths rub. |
F2.2300 | Profit (loss) before tax | 79175 | ths rub. |
F2.2400 | Net income (loss) | 58020 | ths rub. |
F2.2500 | The total financial result of the period | 58020 | ths rub. |