Full legal name: OBSHESTVO S OGRANICHENNOJ OTVETSTVENNOSTYU "TEHNOSERVIS"
Leader: Gusev Igor Vladimirovich
Date of entry in the register: 04.09.2008
The authorized capital: 10 ths rub.
Number of staff: 5
Number of founders: 2
Legal address: RUSSIA, 413113, Saratovskaya area, ENGELSSKIJ, G. ENGELS, UL. 2-YA LENINGRADSKAYA, D.51
E-mail:
Site (www):
Telephone(s): +7(8453)76-83-98
TIN (INN): 6449050008
KPP (tax registration reason code): 644901001
OKPO (All-Russian Classifier of Enterprises and Organizations): 82691270
OGRN (Primary state registration number): 1086449003497
OKFS (National Classification of ownership): 16 - Private property
OKOGU (National Classification of state power and control): 4210014 - Organizations established by legal entities or citizens or legal entities and citizens together
OKOPF (National Classification of legal forms): 12300 - Limited liability companies
OKTMO (National Classification of municipalities): 63650101001
OKATO (National Classification of administrative and territorial division): 63250501 - Saratovskaya area, Regions i administrativnie Regions Saratovskoj area, Engelsskij rajon, citya rajonnogo znacheniya Engelsskogo region, Engels
Main (NACE): 22.25 - Manufacturing, Pulp, paper and paper products, publishing and printing, Publishing, printing and reproduction of recorded media, Printing and service provision in this area, Additional activities related to printing
Additional:
18.21 | Manufacture of workwear |
18.2 | Manufacture of wearing apparel, of textile materials and clothing accessories |
18.24 | Manufacture of other wearing apparel and accessories |
19.30 | Footwear |
22.22 | printing activity not nec |
22.25 | Additional activities related to printing |
30.02 | Manufacture of computers and other information processing equipment |
33.20 | Manufacture of instruments and appliances for measuring, monitoring, testing, navigation, control, and other purposes |
45.21.2 | Civil works for the construction of bridges, elevated highways, tunnels and subways |
45.23 | Construction of roads, airfields and sports facilities |
45.23.1 | Civil works for the construction of roads, railways and runways runways |
45.21.3 | Civil works for laying of pipelines, communication lines and power lines |
45.21.4 | Civil works for laying and laying pipelines, communication and power lines, including related ancillary works |
45.21.5 | Civil works for the construction of power plants and installations for the mining and manufacturing industries |
45.21.51 | Civil works for the construction of hydroelectric power plants |
45.21.52 | Civil works for the construction of nuclear power plants |
45.21.53 | Civil works for the construction of thermal power plants and other |
45.24 | Construction of water projects |
45.24.2 | Construction of hydraulic structures |
45.21.54 | Civil works for the construction of facilities for the mining and manufacturing industries |
45.21.6 | Civil works for the construction of other buildings and structures, not nec |
45.11 | Demolition of buildings, processing of digging |
45.11.1 | Demolition, clearing of building sites |
45.11.2 | excavate |
45.3 | Installation of building services and structures |
45.25.4 | Installation of metal constructions |
45.25.5 | Production Masonry |
45.21.7 | Installation of buildings, prefabricated |
51.1 | Wholesale trade through agents (for a fee or contract basis) |
51.4 | Wholesale trade of household goods |
51.5 | Wholesale of non-agricultural intermediate products, waste and scrap |
52.4 | Other retail sale in specialized stores |
70.20 | Letting of own property |
74.4 | Promotional activities |
71.32 | Rental of construction machinery and equipment |
71.3 | Renting of other machinery and equipment |
Find similar businesses (with the same NACE and OKATO)
Name | Share | Amount |
GUSEV IGOR VLADIMIROVICH | 50% | 5 ths rub. |
PLOHIH ANASTASIYA IGOREVNA | 50% | 5 ths rub. |
Financial statements (accounting figures): | |||
Code | Indicator | Value | Unit |
F1.1100 | Total for Section I - Non-current assets | 0 | ths rub. |
F1.1200 | Total for Section II - Current assets | 0 | ths rub. |
F1.1600 | BALANCE (asset) | 4899 | ths rub. |
F1.1300 | Total for Section III - Own capital | 1717 | ths rub. |
F1.1400 | Total for Section IV - Long-term liabilities | 0 | ths rub. |
F1.1500 | Total for Section V - Short-term liabilities | 0 | ths rub. |
F1.1700 | BALANCE (passive) | 4899 | ths rub. |
F2.2100 | Gross profit (loss) | 0 | ths rub. |
F2.2200 | Profit (loss) from sales | 0 | ths rub. |
F2.2300 | Profit (loss) before tax | 0 | ths rub. |
F2.2400 | Net income (loss) | 357 | ths rub. |
F2.2500 | The total financial result of the period | 0 | ths rub. |